STS 30 inch pump shell from on-site 3D scanning, to analysis of the wear area, to thickening design of wear points, and modeling and production. Green Equipment's US office's and Chinese office's excellent mechanical engineers worked closely together and achieved the shortest production time with the best design. Both sides put in a lot of effort.
The STS 10x10-30 MP high chrome alloy wear-resistant pump shell we produced has replaced the original Metso parts on 23rd, May 2024. It is known that the average service life of original Metso parts is 5-6 months. When installing our pump, the thickness of the pump shell's extreme wear-resistant area was tested to be 100mm. After three months of continuous sand extraction, the thickness was tested again on 28th, August, 2024, and it was 73mm. That is to say, the wear rate was only 30% after three months working. The average service life is estimated to exceed 9 months.
(STS parts on Metso 10x10-30 dredge pump,Typical pump shell life is 5-6 months, STS pump shell installed on 5/23/2024, Reading taken on 8/28/2024, original thickness is 100mm)
We not only achieve the complete replacement of old parts, but also optimize and improve the service life, saving customers maintenance time and costs.